Construction cost estimating software free download

broken image
broken image

Attach any relevant photos and documents.

broken image

A change order should contain the following information:

broken image

What information should be included on a change order?Ī properly structured change order should be descriptive of the work being done and have enough information to determine the cost and timeline impact, if any, on the project.

broken image